Corrosion Removal – Hamilton Island Yacht Club

Corrosion Removal and Ongoing Corrosion Protection After only 6 months after opening, tea staining corrosion was appearing on all the stainless steel downpipes on the structure. These were designed as a striking feature to the design.Management approached Action Corrosion for a solution to remove the corrosion and most importantly, provide a long term corrosion protection…

Corrosion Removal – Caltex Refinery

Corrosion Removal and Ongoing Corrosion Protection Corrosion Removal and Ongoing Corrosion Protection ng, tea staining corrosion was appearing on all the stainless steel downpipes on the structure. These were designed as a striking feature to the design. Management approached Action Corrosion for a solution to remove the corrosion and most importantly, provide a long term…

Jacks Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. The bearings on both abutment were covered in ballast, dirt and plant life. Once the top of the piers were cleaned…

Macquarie River Bridge, Dubbo. NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Bearings are generally dry, rusted and covered in dirt and plant life. A slide plate bearing at the start of the truss which…

Namoi River Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 19th – 22nd June, 2018. Bearing rust removal, cleaning, painting, greasing and oiling. Report on service and any defects identified. Rust remove and protect with Action Corrosion. Slide Plate Bearings and Pot Bearings.  The slide plate bearings on this 27 span structure are in generally good condition.…

Polly’s Motel

USTED STEEL DOOR FRAME REPAIR Our first step was to remove all rust and paint to a bare metal finish using a specialised wire brush attachment and Action Rust Removal Gel. Due to the large amount of debris thrown around during prep, Action Corrosion use a custom built PVC frame covered with a tarp which…

QLD RAIL

Rust removal and application of protective coatings to heavily rusted Brookes Street Bridge, Fortitude Valley Brooke street bridge was de-rusted and painted within a 38hr time frame in partnership between Action Corrosion & QLD Rail.Action Corrosion staff water grit blasting from a crane which is the preferred method when dealing with the possibility of lead…

Quipolly Creek, Quipolly, NSW

Project Description : Roller Rehab Bridge Bearing Service. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Bearings generally had surface rust only and required cleaning prior to  servicing.   Concrete bearing bed has lifted and cracked and requires a repair.    Before and After. Bearings cleaned, de-rusted and coated.…