Baltimore Creek Bridge Ballimore, NSW.

Project Description : Roller Rehab Bridge Bearing Service, 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Ballast covered and surrounded bearings on the abutments. The coating had failed on the bearings and was cracking off. Where the paint was removed light rust had started to…

Talbragar River Bridge, Elong Elong NSW.

Project Description : Roller Rehab Bridge Bearing Service , 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Recently replaced pot bearings on both the abutment and next pier are in excellent condition. The rusted ‘nest of rockers’ bearing…

Jacks Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. The bearings on both abutment were covered in ballast, dirt and plant life. Once the top of the piers were cleaned…

QLD RAIL

Rust removal and application of protective coatings to heavily rusted Brookes Street Bridge, Fortitude Valley Brooke street bridge was de-rusted and painted within a 38hr time frame in partnership between Action Corrosion & QLD Rail.Action Corrosion staff water grit blasting from a crane which is the preferred method when dealing with the possibility of lead…

Bridge Roller Rehab at Emu,Wallaby and Ivory Creek Bridges – July 2022

Action Corrosion Roller Rehab bridge bearing service on three steel structures for QLD Main Roads and Roadtek. Rusted and frozen bridge bearings de-rusted, painted and lubricated. Bearings now free with girders retracting up to 7mm in one week following Action Corrosion Bridge Bearing Service. Action Corrosion Bridge service to lubricate bridge bearings every 5 years…