Photographs of Roller Rehab Service

Screen Shot 2018-08-28 at 1.47.35 pm Screen Shot 2018-08-28 at 1.47.41 pm Screen Shot 2018-08-28 at 1.47.48 pm

Dry cloth wadding and even clothing was removed between the rollers on piers one and three, once cleared the rollers were pressure cleaned.

Screen Shot 2018-08-28 at 1.56.23 pm

The rollers at both abutments were surrounded by ballast and debris. This areas was cleared and the bearings cleaned.

Screen Shot 2018-08-28 at 1.57.06 pm

The bearings were oiled, greased painted and marked to determine future movement.

Screen Shot 2018-08-28 at 1.57.42 pm

Serviced pivots on Pier 2.

Screen Shot 2018-08-28 at 1.58.44 pm Screen Shot 2018-08-28 at 1.58.48 pm

Measurements taken from the bearings on Pier 4

Screen Shot 2018-08-28 at 1.59.52 pm

BEFORE Open end posts filled with debris. Drainage hole is blocked.

Screen Shot 2018-08-28 at 2.00.30 pm Screen Shot 2018-08-28 at 2.00.37 pm

AFTER Treated open end posts cleaned and painted. Mesh was placed over the treated area to protect the hole from future debris build up.

Screen Shot 2018-08-28 at 2.01.24 pm Screen Shot 2018-08-28 at 2.01.30 pm

We recommend the larger enclosed end posts also be cleaned and de-rusted in future. These are full of rubbish and pose a needle stick hazard so a suction machine would be required.

Recommendation.

  1. Treat all 6 small nest of rollers on both abutments and pier 4 with Roller Rehab Bath to be filled with degreaser, Action Gel and Lanocoat oil.
  2. Suction out rubbish from 8 larger enclosed end posts, clear out holes and paint. Fit wire mesh to collect rubbish.
  3. Re Grease bearings in 5 years.