Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018.

Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified.

Screen Shot 2018-05-21 at 10.42.52 AM

The bearings on both abutment were covered in ballast, dirt and plant life.

Screen Shot 2018-05-21 at 10.43.12 AMScreen Shot 2018-05-21 at 10.43.29 AM

Once the top of the piers were cleaned and the bearings pressure washed the bearings were found to be defect free and serviceable. The oiling and greasing points were now clear to take a lubricant.

Screen Shot 2018-05-21 at 10.46.21 AMScreen Shot 2018-05-21 at 10.46.04 AM

Bearings were painted, oiled and greased as shown.

Screen Shot 2018-05-21 at 10.46.50 AM

Bearings were marked and dated to gauge future movement to ensure the slide bearings are moving as they should. No defects were detected on any bearing on the structure.

Screen Shot 2018-05-21 at 10.47.07 AMScreen Shot 2018-05-21 at 10.47.51 AM

A bent and rusted cross brace  which has impact damage. De-rusted and coated to provide corrosion protection until the brace is repaired.