The heavily rusted frames were unbolted and craned down.
The whole frame was then water/grit blasted to identify which areas needed to be repaired.
Then, the heavily rusted sections were cut out and new plates were welded in.
It received a prime coat and was ready for the top coat. The Frames were top coated and put back into service.