Wyong Creek Bridge, Muswellbrook NSW
Project Description : Bearing Cover Design, Fabrication and fitting following Roller Rehab Bridge Bearing Service on 5th April, 2017.
Project Description : Bearing Cover Design, Fabrication and fitting following Roller Rehab Bridge Bearing Service on 5th April, 2017.
Project Description : Roller Rehab Bridge Bearing Service , 17th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Mark bearings to gauge future movement. Ballast and debris on and around bearings on both abutments. Three bearing anchoring nuts were found to be loose. They were tightened on…
Project Description : Roller Rehab Bridge Bearing Service , 13-16 August, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Remove debris, clear drain holes, clean and coat base of open end posts on truss bridge. Photographs of Roller Rehab Service…
Rusted Gantries with severe crevice rust. Rusted gantry Structures were water/grit blasted to remove all rust All crevices and bare metal surfaces treated with crevice sealer. Gantries finally sprayed with two top coats of high metal content two pac paint.
Project Description : Roller Rehab Bridge Bearing Service , 17-21 August, 2018. Bearing rust removal, cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Bridge Bearing Descriptions. This 18 span bridge has girder spans on each side of the river and three large…