Wyong Creek Bridge, Muswellbrook NSW
Project Description : Bearing Cover Design, Fabrication and fitting following Roller Rehab Bridge Bearing Service on 5th April, 2017.
Project Description : Bearing Cover Design, Fabrication and fitting following Roller Rehab Bridge Bearing Service on 5th April, 2017.
WHITSUNDAY DESALINATION PLANT Rust Protective Coatings Action Corrosion Pty Ltd, supplies Action Clear Coat to this desalination plant on an ongoing basis. Action Clear Coat prevents corrosion in this high salt, high humidity environment, and keeps the pipework maintenance free and easy to inspect.
The heavily rusted frames were unbolted and craned down. The whole frame was then water/grit blasted to identify which areas needed to be repaired. Then, the heavily rusted sections were cut out and new plates were welded in. It received a prime coat and was…
Project Description : Roller Rehab Bridge Bearing Service , 17th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Mark bearings to gauge future movement. Ballast and debris on and around bearings on both abutments. Three bearing anchoring nuts were found to be loose. They were tightened on…
Refurbishment of large dugong and shark tanks at the Sydney Aquarium. Action Corrosion undertook a refurbishment of the filter pontoons which service the large dugong & shark tanks at the Sydney Aquarium. The process required the removal of heavy rust from the deck & then protective coatings were applied. Finally, the deck was top coated…
Corrosion Removal and Ongoing Corrosion Protection MANTRA HOTEL BROADBEACH, QLD Rust Removal and Maintenance Action Corrosion have ongoing maintenance work at Mantra Hotel Broadbeach, QLD. This work has included rust removal with Action Rust Removal Gel and application of a specialised moisture cured urethane coating to the large metal awning which surrounds the entire commercial…
Corrosion Removal and Ongoing Corrosion Protection Rust Protection of Devco Sulphur Processing Plant Devco Sulphur Processing Plant, within the BP Bulwar Island Refinery Complex Brisbane, experience heavy rust on electric motors and plant equipment within the plant. As a result, production stalls and much time is lost replacing expensive machinery. Action Corrosion were called in…
Project Description : Roller Rehab Bridge Bearing Service. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Bearings generally had surface rust only and required cleaning prior to servicing. Concrete bearing bed has lifted and cracked and requires a repair. Before and After. Bearings cleaned, de-rusted and coated.…
USTED STEEL DOOR FRAME REPAIR Our first step was to remove all rust and paint to a bare metal finish using a specialised wire brush attachment and Action Rust Removal Gel. Due to the large amount of debris thrown around during prep, Action Corrosion use a custom built PVC frame covered with a tarp which…
Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. The bearings on both abutment were covered in ballast, dirt and plant life. Once the top of the piers were cleaned…