Ten Mile Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 17th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Mark bearings to gauge future movement. Ballast and debris on and around bearings on both abutments. Three bearing anchoring nuts were found to be loose. They were tightened on…

SEA LIFE SYDNEY AQUARIUM

Refurbishment of large dugong and shark tanks at the Sydney Aquarium. Action Corrosion undertook a refurbishment of the filter pontoons which service the large dugong & shark tanks at the Sydney Aquarium. The process required the removal of heavy rust from the deck & then protective coatings were applied. Finally, the deck was top coated…

Rust Removal – Mantra Hotel Broadbeach

Corrosion Removal and Ongoing Corrosion Protection MANTRA HOTEL BROADBEACH, QLD Rust Removal and Maintenance Action Corrosion have ongoing maintenance work at Mantra Hotel Broadbeach, QLD. This work has included rust removal with Action Rust Removal Gel and application of a specialised moisture cured urethane coating to the large metal awning which surrounds the entire commercial…

Rust Protection – BP Refinery Brisbane

Corrosion Removal and Ongoing Corrosion Protection Rust Protection of Devco Sulphur Processing Plant Devco Sulphur Processing Plant, within the BP Bulwar Island Refinery Complex Brisbane, experience heavy rust on electric motors and plant equipment within the plant. As a result, production stalls and much time is lost replacing expensive machinery. Action Corrosion were called in…

Quipolly Creek, Quipolly, NSW

Project Description : Roller Rehab Bridge Bearing Service. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Bearings generally had surface rust only and required cleaning prior to  servicing.   Concrete bearing bed has lifted and cracked and requires a repair.    Before and After. Bearings cleaned, de-rusted and coated.…

Polly’s Motel

USTED STEEL DOOR FRAME REPAIR Our first step was to remove all rust and paint to a bare metal finish using a specialised wire brush attachment and Action Rust Removal Gel. Due to the large amount of debris thrown around during prep, Action Corrosion use a custom built PVC frame covered with a tarp which…

Jacks Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. The bearings on both abutment were covered in ballast, dirt and plant life. Once the top of the piers were cleaned…