Restoration Project – MANTRA RESORT @ 1770

Corrosion Removal and Ongoing Corrosion Protection Corrosion Restoration Project Action Corrosion were approached to put together a corrosion assessment report for Mantra @1770. In that report we identified (9) large heavily rusted roofing skylights, rusted gutter supports, rusted roofing and screws and corrosion to a number of roof supports. After prioritising the work required, we…

Rust Protection – BP Refinery Brisbane

Corrosion Removal and Ongoing Corrosion Protection Rust Protection of Devco Sulphur Processing Plant Devco Sulphur Processing Plant, within the BP Bulwar Island Refinery Complex Brisbane, experience heavy rust on electric motors and plant equipment within the plant. As a result, production stalls and much time is lost replacing expensive machinery. Action Corrosion were called in…

Rust Protection – Settlers Cover Precinct Noosa

Corrosion Removal and Ongoing Corrosion Protection Rust Protection, Commercial Air-Conditioning Installation Action Corrosion were referred to this complex through a number of adjacent unit complexes we had previously worked on in the area. As well as the stainless steel corrosion protection, we also treated the commercial air-conditioning installation on the roof, which comprised of 36…

Rust Removal – Mantra Hotel Broadbeach

Corrosion Removal and Ongoing Corrosion Protection MANTRA HOTEL BROADBEACH, QLD Rust Removal and Maintenance Action Corrosion have ongoing maintenance work at Mantra Hotel Broadbeach, QLD. This work has included rust removal with Action Rust Removal Gel and application of a specialised moisture cured urethane coating to the large metal awning which surrounds the entire commercial…

SEA LIFE SYDNEY AQUARIUM

Refurbishment of large dugong and shark tanks at the Sydney Aquarium. Action Corrosion undertook a refurbishment of the filter pontoons which service the large dugong & shark tanks at the Sydney Aquarium. The process required the removal of heavy rust from the deck & then protective coatings were applied. Finally, the deck was top coated…

Talbragar River Bridge, Elong Elong NSW.

Project Description : Roller Rehab Bridge Bearing Service , 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Recently replaced pot bearings on both the abutment and next pier are in excellent condition. The rusted ‘nest of rockers’ bearing…

Ten Mile Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 17th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Mark bearings to gauge future movement. Ballast and debris on and around bearings on both abutments. Three bearing anchoring nuts were found to be loose. They were tightened on…