Skip to content
1300 731 311admin@actioncorrosion.com.au
Where to Buy
Search:
Facebook page opens in new windowInstagram page opens in new windowYouTube page opens in new window
Action Corrosion
Rust Removal and Protection
Action CorrosionAction Corrosion
  • Home
  • About Us
    • FAQ’s
  • Products
  • Coating Services
  • Projects
  • Store Locations
  • Blog
  • Contact Us
  • Home
  • About Us
    • FAQ’s
  • Products
  • Coating Services
  • Projects
  • Store Locations
  • Blog
  • Contact Us

BURNETT RIVER BRIDGE BEARING RUST REMOVAL, INTERNAL CLEANING, PAINTING, GREASING, AND OILING

You are here:
  1. Home
  2. Project
  3. BURNETT RIVER BRIDGE BEARING RUST…

Along the approaches there are small plates which appear to connect both the free expansion end and the adjoining fixed end of beams. A new walkway has been bolted to one side of the entire length of the structure. Whilst the handrail appears to have allowances for movement.

 

            

 

Category: BridgesApril 1, 2019

Project navigation

PreviousPrevious project:Wet’n’Wild Super 8 Aqua RacerNextNext project:CONCRETE TREAD REPLACEMENT WET ‘ N WILD

Related projects

ZoomDetails
ZoomDetails
ZoomDetails
ZoomDetails
ZoomDetails
Contact Us
Google Rating
ACTION CORROSION - Rust Protection
See all reviewsWrite a review
powered by Google
  • Phone:
    1300 731 311
  • E-mail:
    admin@actioncorrosion.com.au

Find us on:

Facebook page opens in new windowYouTube page opens in new windowInstagram page opens in new window
Quick Links

Products

Projects

Store Locations

Our Story

Before / After Results

Testimonials

 

Recent Projects
Useful links

© 2025 Action Corrosion

Go to Top