Talbragar River Bridge, Elong Elong NSW.

Project Description : Roller Rehab Bridge Bearing Service , 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Recently replaced pot bearings on both the abutment and next pier are in excellent condition. The rusted ‘nest of rockers’ bearing…

Baltimore Creek Bridge Ballimore, NSW.

Project Description : Roller Rehab Bridge Bearing Service, 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Ballast covered and surrounded bearings on the abutments. The coating had failed on the bearings and was cracking off. Where the paint was removed light rust had started to…

Macquarie River Bridge, Dubbo. NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Bearings are generally dry, rusted and covered in dirt and plant life. A slide plate bearing at the start of the truss which…

Namoi River Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 19th – 22nd June, 2018. Bearing rust removal, cleaning, painting, greasing and oiling. Report on service and any defects identified. Rust remove and protect with Action Corrosion. Slide Plate Bearings and Pot Bearings.  The slide plate bearings on this 27 span structure are in generally good condition.…

Quipolly Creek, Quipolly, NSW

Project Description : Roller Rehab Bridge Bearing Service. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Bearings generally had surface rust only and required cleaning prior to  servicing.   Concrete bearing bed has lifted and cracked and requires a repair.    Before and After. Bearings cleaned, de-rusted and coated.…