Restoration Project – MANTRA RESORT @ 1770

Corrosion Removal and Ongoing Corrosion Protection Corrosion Restoration Project Action Corrosion were approached to put together a corrosion assessment report for Mantra @1770. In that report we identified (9) large heavily rusted roofing skylights, rusted gutter supports, rusted roofing and screws and corrosion to a number of roof supports. After prioritising the work required, we…

Corrosion Removal – Caltex Refinery

Corrosion Removal and Ongoing Corrosion Protection Corrosion Removal and Ongoing Corrosion Protection ng, tea staining corrosion was appearing on all the stainless steel downpipes on the structure. These were designed as a striking feature to the design. Management approached Action Corrosion for a solution to remove the corrosion and most importantly, provide a long term…

Corrosion Removal – Hamilton Island Yacht Club

Corrosion Removal and Ongoing Corrosion Protection After only 6 months after opening, tea staining corrosion was appearing on all the stainless steel downpipes on the structure. These were designed as a striking feature to the design.Management approached Action Corrosion for a solution to remove the corrosion and most importantly, provide a long term corrosion protection…

QLD RAIL

Rust removal and application of protective coatings to heavily rusted Brookes Street Bridge, Fortitude Valley Brooke street bridge was de-rusted and painted within a 38hr time frame in partnership between Action Corrosion & QLD Rail.Action Corrosion staff water grit blasting from a crane which is the preferred method when dealing with the possibility of lead…

SEA LIFE SYDNEY AQUARIUM

Refurbishment of large dugong and shark tanks at the Sydney Aquarium. Action Corrosion undertook a refurbishment of the filter pontoons which service the large dugong & shark tanks at the Sydney Aquarium. The process required the removal of heavy rust from the deck & then protective coatings were applied. Finally, the deck was top coated…

Jacks Creek Bridge, Narrabri NSW

Project Description : Roller Rehab Bridge Bearing Service , 21th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. The bearings on both abutment were covered in ballast, dirt and plant life. Once the top of the piers were cleaned…

Talbragar River Bridge, Elong Elong NSW.

Project Description : Roller Rehab Bridge Bearing Service , 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Mark bearings to gauge future movement and report on service and any defects identified. Recently replaced pot bearings on both the abutment and next pier are in excellent condition. The rusted ‘nest of rockers’ bearing…

Baltimore Creek Bridge Ballimore, NSW.

Project Description : Roller Rehab Bridge Bearing Service, 24th April, 2018. Bearing rust removal, internal cleaning, painting, greasing and oiling. Report on service and any defects identified. Ballast covered and surrounded bearings on the abutments. The coating had failed on the bearings and was cracking off. Where the paint was removed light rust had started to…